Ho Chi Minh City launches GIS portal for transparent urban planning lookups
In light of the recently unveiled Ho Chi Minh City Master Plan for the period extending from 2025 to 2050, which encompasses a vision for the next century, the Director of the HCMC Department of Planning and Architecture, Truong Trung Kien, detailed the essential initiatives that the city intends to implement to realize this strategic blueprint.
Director Kien emphasized the prioritized actions that HCMC will focus on until 2030 to effectively translate the Master Plan into tangible outcomes. Currently, the HCMC Department of Planning and Architecture is collaborating with various departments, agencies, and organizations to assist the HCMC People’s Committee in formulating an action plan for implementation.
This strategic roadmap aims to break down overarching goals into specific tiers of planning, programs, and projects, while also clearly designating responsible parties and deadlines for completion.
By 2027, HCMC plans to establish zoning and general plans for its entire area of 6,772 square kilometers, which includes 168 wards, communes, and the Con Dao Special Zone. This new planning framework is set to replace older plans that were developed under separate master plans prior to the merger of localities.
Several high-priority areas have been identified for immediate planning efforts, including central urban zones, growth poles, satellite centers, and Transit-Oriented Development (TOD) zones along metro lines, which aim to align urban expansion with public transportation options.
Additionally, emphasis will be placed on zoning plans that have already received approval from the HCMC People’s Committee for drafting or comprehensive adjustments, as well as areas designated for strategic projects and four specialized technical infrastructure plans that encompass transportation, ground elevation and drainage, water supply, and solid waste management, including cemeteries.
A major focus of the Master Plan is the enhancement of traffic infrastructure to connect the city’s five growth poles. The city envisions developing into a multi-polar, multi-centered megacity, organized around five growth poles, five satellite centers, five strategic connectivity corridors, and ten governance zones. The five growth poles include:
- The central international financial core;
- The eastern innovation hub;
- The northern industry and logistics center;
- The southern seaports, free trade, and energy zone;
- The western urban, education, and healthcare hubs.
High-capacity public transportation, particularly rail systems, will form the backbone connecting these key areas. Following the TOD model, public transit will play a leading role in shaping urban growth.
By 2050, HCMC aims to complete 18 Mass Rapid Transit (MRT) lines, totaling approximately 960 kilometers, along with 450 kilometers of Light Rail Transit (LRT) and tram systems. Public transport is expected to accommodate between 35 to 50 percent of travel demand by 2030, increasing to 50 to 60 percent by 2035, and reaching 65 percent between 2045 and 2050.
Key routes will include four groups along the Binh Duong–HCMC–Ba Ria–Vung Tau regional rail axis, North-South inter-regional roads, high-speed urban arterial roads, and elevated or underground expressways with a minimum of four lanes, supplemented by national railways, waterways, and logistics networks.
Director Kien also announced that residents can access planning details and information regarding their properties through various official channels. The HCMC Construction GIS Portal, which provides urban and rural planning data, has been operational since May 19 and can be accessed at https://gisxaydung.tphcm.gov.vn/tracuuttqh.
This portal allows residents to easily retrieve official planning information at any time, reducing the need for in-person visits to administrative offices and enhancing transparency in urban and rural planning management.
It is important to clarify that the GIS portal is intended solely as an informational resource and does not replace official planning documents or formal confirmations from relevant authorities. For issues requiring written confirmation of land parcel planning, residents can submit applications online at https://dichvucong.gov.vn.
Regarding the criteria for evaluating stalled plans and delayed projects, Director Kien explained that the city’s Master Plan serves as a basis for reviewing these areas. The review process must ensure that HCMC’s long-term development goals are upheld while addressing obstacles that affect residents' daily lives.
The Planning and Architecture Department, in coordination with local People’s Committees and other relevant agencies, will assess projects based on five criteria: alignment with the Master Plan and development needs; feasibility of funding, execution capacity, compensation, resettlement, and timelines; current land-use status and execution progress; capacity of supporting infrastructure; and the impact on local residents.
These assessments will inform tailored solutions, allowing essential and feasible areas to proceed with clear resources and milestones. Areas with promising objectives but impractical execution methods will be reviewed for adjustments. Elements deemed unsuitable will be recommended for modification or cancellation based on legal grounds.
Throughout this evaluation process, the legitimate needs of residents will be prioritized and addressed in accordance with existing planning laws. Citizens can seek guidance from administrative offices in their wards, communes, or special zones, as the Planning and Architecture Department and local authorities work together to provide information and protect residents' rights.
Director Kien then shifted the focus to the development plans for schools, healthcare facilities, and parks in rapidly growing residential areas.